These photographs and specifications are from the Burkwood Raquetball Club, a 2,500 gallon per day system that is on a drainfield, and uses the AdvanTex Treatment System for advanced secondary treatment.

Specifications:
Peak Sewage Flow:2,500 gallons per day
Estimated Percolation Rate:55 minutes per inch (Class III Soils)
Septic Tank:5,000 gallon - concrete top seam
Treatment Tank:3,000 gallon - top seam
Pump Chamber:2,500 gallon - top seam
AdvanTex Module:AX-20 - three units
Modules are time dosed for 30 seconds and rested for 9.5 minutes
Disposal Method:Multiple drainfield configuration that is demand dosed from the pump chamber.





2,500 gallon pump station.

5,000 gallon top seam septic tank
followed by a 3,000 gallon top
seam processing tank.

Contractor laid a 6" gravel pad on top
of the septic tank prior to placing
the AdvanTex Treatment Modules.

The AdvanTex Modules set in place.

We used a conventional pump vault,
with standard filter, float tree, and
standard pump package.

We used an Orenco Automatic
Distributing Valve, to allow
dosing to a single module at a time.

Dual Panels operate the AdvanTex
pump system, as well as
the drainfield dosing pumps.

AdvanTex Control Panel.

Pump Chamber control panel.